01/The setup
Strong systems, scattered context
The systems were already there. The challenge was connecting the context between them.
Asset history could sit in one system while the live job sat in another. Energy and performance reporting took specialist time to assemble. Issues that crossed systems were harder to see as one picture.
Inspectr was brought in to connect that context and put it in front of the person who needed it.
02/How it started
Start with the operation, not the software
Inspectr’s team spent a week on site with engineers, energy managers, the Remote Command Centre and property managers.
The problems were practical: duplicate tickets, maintenance schedules out of sync, stalled jobs needing manual follow-up and energy reports built by hand.
The King’s Cross Group set the problem statements, approved the data-sharing framework and opened up the relevant estate systems. A steering group gave each idea one route from problem to live workflow.
Within months, those workflows were running across the estate.
03/Energy reporting
Weeks back
Specialist time, given back
The estate’s energy reporting now builds directly from meter data and lands within 0.09% of the manual methodology it replaced.
That gives weeks of specialist time back across the year.
When a reading goes missing or a meter changes, the report flags the gap and who needs to act, rather than letting it carry forward unnoticed.
04/SLA performance
Live
One live view of work against SLA
A live SLA and performance dashboard gives the estate one view of open work against its SLA, with anything running past it identified for action.
05/Maintenance
Every job
Engineers start with the history in hand
Every new reactive work order now arrives with an AI diagnostic pack inside the existing CAFM.
Inspectr pulls together the asset history, relevant documentation and what resolved similar issues before, so the engineer starts with context rather than searching for it.
No new system. No new login.
06/BMS monitoring
Every morning
Problems that don’t look like alarms
Each weekday, overnight BMS alarms and energy performance are reviewed before the engineering team starts.
In one building, that review found heating and cooling running at the same time.
The issue sat in the control strategy rather than showing up as a single alarm. Inspectr brought the evidence together across systems and gave the engineering team a clearer starting point for investigating it.
